Update on the kitchen progress
The walls are textured/painted went from yellow to gray.
White tile (free) backsplash is in. Old backslash removed, greenboard installed, tile installed, then grouted in gray.
Counters bolted down & now have 10 coat of beeswax/oil
New fridge arrived/ door switched sides,
Moved everything from 22cu foot fridge to 10 cu foot!
Old fridge moved out to the garage.
Rearranged everything, mopped floors
Moved dining table & sideboard
Soap dispenser installed in sink,
Pot rack fabricated, painted & installed
New cabinet w drawers painted, capped w butcher block, waxed and installed to right of stove
Molding reinstalled
Pictures moved
😍
Chris = rockstar
White tile (free) backsplash is in. Old backslash removed, greenboard installed, tile installed, then grouted in gray.
Counters bolted down & now have 10 coat of beeswax/oil
New fridge arrived/ door switched sides,
Moved everything from 22cu foot fridge to 10 cu foot!
Old fridge moved out to the garage.
Rearranged everything, mopped floors
Moved dining table & sideboard
Soap dispenser installed in sink,
Pot rack fabricated, painted & installed
New cabinet w drawers painted, capped w butcher block, waxed and installed to right of stove
Molding reinstalled
Pictures moved
😍
Chris = rockstar
What's left?
Replace light box lighting w recessed lights
Change out all outlets to gfi
Find and install bamboo blinds in all the windows